Skip to content

Fix pipelie failures about brand_text

张泽华请求将fix-pipeline-failures-230608合并到main-jh

What does this MR do and why?

1. Fix pipeline failures about brand_text

Author: @zhzhang

Related to failed jobs: https://jihulab.com/gitlab-cn/gitlab/-/jobs/7998404 https://jihulab.com/gitlab-cn/gitlab/-/jobs/7998402 https://jihulab.com/gitlab-cn/gitlab/-/jobs/7998380

Related to upstream commit: https://gitlab.com/gitlab-org/gitlab/-/commit/9998eba30afefed3ac37f38b9f33aeec0065cd27

2. Fix pipeline failures about i18n

Author: @luzhiyuan.deer

Fix failed job: static-analysis-jh

This renames the purchasing-related pages from CI/CD minutes (and similar) to compute or units of compute, as needed.

Related Upstream MR: https://gitlab.com/gitlab-org/gitlab/-/merge_requests/122601

Screenshots or screen recordings

Screenshots are required for UI changes, and strongly recommended for all other merge requests.

Before After

How to set up and validate locally

Numbered steps to set up and validate the change are strongly suggested.

MR acceptance checklist

This checklist encourages us to confirm any changes have been analyzed to reduce risks in quality, performance, reliability, security, and maintainability.

路志远 编辑于

合并请求报告